Incineration plant Safimet S.p.A.

By | 2018-02-21T13:51:47+00:00 15.01.2016|Incineration plant|

MONTH OF JANUARY 2016

Client – Safimet S.p.A.

Engineering and construction of a thermodestruction plant with a potenziality of 1.000.000 kCal/h, for the treatment of:

  • metal waste (for the recovery of the precious metale);
  • solid and liquid special wastes.

Scope of supply:

  • wastes charging system;
  • rotary kiln Ø 2.00 x 8.000 mm;
  • post-combustion chamber Ø 3.30 x 9.500 mm;
  • discharging system for the treated wastes.